Photos from Our Past Lean Construction Courses
CT Engineering & Constructions Sdn Bhd
Pasir Gudang, Johor
CT Engineering & Construction started its Lean Construction's training in May 2015. Their end in mind is to inject new knowledge for company growth. A total of 18 staff were involved in the training together with the Owner.
As ‘Waiting' time is the biggest “WASTE'” in any construction companies, I introduced the Last Planner System using Villego Simulation.
The LPS, emphasizing on collaborative planning using stickie’s for one of their on-going (short term) five-week project. It went very well. The plan now is to use LPS for a longer-term project involving building 56 units of bungalow & semi-detached factories. It is a 18 months project.
I trust this is one of the 1st construction companies in Malaysia using LPS.
Lean Construction Introduction in Collaboration with MPC and CIDB
Lean Construction Introduction in collaboration with MPC and CIDB - Last Planner® System (LPS) @ MPC Kuantan
(2 Dec 2015)
Lean Construction Introduction in collaboration with MPC and CIDB - Last Planner® System (LPS) @ MPC Johor Bahru
(24 Nov 2015)
Lean Construction Introduction in collaboration with MPC and CIDB - Last Planner® System (LPS) @ MPC Kota Kinabalu (12 Nov 2015)
Lean Construction Introduction in collaboration with MPC and CIDB - Last Planner® System (LPS) @ MPC Kuching
(10 Nov 2015)
Lean Construction Introduction in collaboration with MPC and CIDB - Last Planner® System (LPS) @ MPC Penang
(8 Oct 2015)
Lean Construction Introduction in collaboration with MPC and CIDB - Last Planner® System (LPS) @ MPC Petaling Jaya
(27 Aug 2015)